References

ArmaFlex® Ultima for cryogenic application

Tanks_Anif_Austria_background.png

Our collaboration with Air Liquide has set new benchmarks in the insulation of cryogenic systems, achieving remarkable results that underscore the performance, reliability and durability of ArmaFlex Ultima.


Discover the full project

Enhancing fire safety with ArmaFlex Ultima® at Labesfal S.A

MicrosoftTeams-image__21_.png

Fresenius Kabi once again relied on our low-smoke insulation materials for technical insulation in their new production unit Labesfal S.A.



Discover the full project

Moon Habitat Prototype

Earth_-_daylight.jpg

SAGA Architects and Armacell move an innovative step forward – ROSIE, the world’s tallest 3D-printed polymer structure with a height of 7 metres. 

Download the case study

Lunark Moon Habitat

lunark_01.jpg

In 2020 SAGA Architects and Armacell set up a moon mission in Arctic Greenland – a practical test of how to make space liveable for future travellers. 

Download the case study

Replacing failed low-temperature insulation with ArmaFlex Cryogenic Systems

APA_Dandenong_Image5.jpg

Maximum functional reliability and high cost effectiveness

Learn more

ArmaFlex Ultima in Scandinavia’s first clinic for proton therapy

Armaflex_Uppsala-88.jpg

New safety standard in technical insulation

Learn more

Arma-Chek Silver in the world’s largest lyocell plant

Bild_1__Copyright_Armacell.jpg

Austrian Vöcklabruck district is the site of Europe’s biggest ever Arma-Chek project

Learn more